Enter your built-up area and structure type to see total TMT steel in kg, the share by bar diameter, the number of 12 m bars and an approximate cost. For a single bar size, use the TMT bar weight calculator.

3,750 kg (3.75 tonnes) of TMT steel in total · Approx. ≈ ₹2,32,500

DiameterShare %kg12 m barsAmount
8 mm938198₹58,125
10 mm56376₹34,875
12 mm1,125106₹69,750
16 mm93850₹58,125
20 mm1887₹11,625

Shares are re-balanced to 100%. Change them to match your engineer's bar schedule.

Steel cost by diameter

Total₹2,32,500
  • 8 mm: ≈ ₹58,125 (25.0%)
  • 10 mm: ≈ ₹34,875 (15.0%)
  • 12 mm: ≈ ₹69,750 (30.0%)
  • 16 mm: ≈ ₹58,125 (25.0%)
  • 20 mm: ≈ ₹11,625 (5.0%)

Hover, tap or use the keyboard on any slice, bar or label to highlight it. Only priced items are charted.

This is an approximate planning estimate, not a bar bending schedule or a quotation. Total steel uses a per-1,000 sq ft thumb rule; actual steel depends on the structural design, spans, soil and floors. Bars are counted as whole bars with no lap or wastage allowance. Rate shown is a published or approximate indication; type your own.

Enquire on WhatsApp

How the estimate works

Total steel is taken from a per-1,000 sq ft planning rule for the structure you choose (pillar based or stone based), then split across bar diameters using editable shares. Weight per bar uses the nominal formula d² ÷ 162 kg per metre, the same one used in our TMT bar weight calculator.

More free planning tools

Questions

Common Questions

A common planning thumb rule for a pillar-based RCC house is about 3.5 to 4 kg of TMT steel per sq ft of built-up area, roughly 3,500 to 4,000 kg for 1,000 sq ft. The structural design decides the real figure.
Small diameters such as 8 mm are typically used for stirrups and ties, 10 and 12 mm for slabs, beams and secondary bars, and 16 to 20 mm for main column and beam bars. The default shares are only a starting point; edit them to match your engineer's schedule.
TMT bars are commonly supplied in 12 m lengths. The estimator rounds up to whole bars and does not include lap length or cutting wastage, so confirm the final count with your bar bending schedule.
No. It is a budgeting aid. Use your structural engineer's drawings for ordering exact diameters and lengths.