Enter the units of M-Sand, P-Sand, blue metal, gravel or kundu kal you need and the planner shows how many 4-unit tipper trips that is, whether the last load is part-empty, and the material cost at TKR's published rate.

Your trips

3 tipper trip(s) · 2 full load(s) of 4 units · 1 part load of 2 units

Green = full 4-unit load, orange = part load.

Tip: ordering 12 units instead fills every trip (adds 2 units, ≈ ₹11,200).

Cost

Material: ₹56,000

Rates are TKR rates (updated 18 Oct 2026) per unit on a full 4-unit load within our delivery area; part-load pricing and any extra charge must be confirmed. Nothing is assumed for delivery distance.

Enquire on WhatsApp

How sand and aggregate loads work in Tamil Nadu

Sand, blue metal, gravel and kundu kal are sold by the unit, which is 100 cubic feet or about 2.83 cubic metres. A tipper carries up to four units, so quantities are best planned in multiples of four to avoid paying for a part load.

Estimate the units first with the construction material calculator, then use this planner to turn the total into trips and to see whether a small top-up would fill the last load.

More free planning tools

Questions

Common Questions

A TKR tipper carries up to four units (400 cubic feet) per trip, and our per-unit rates assume a full 4-unit load.
A part load still uses a full trip. If you need 9 units, the third trip carries only 1 unit; ordering 12 units fills it and may suit you better if you will use the extra material. The planner shows the extra cost so you can decide.
No charge is assumed. Our rates are quoted per unit delivered in a 4-unit vehicle within our delivery area. If TKR quotes a separate delivery charge for your site, enter it and the planner adds it per trip.
Tenkasi and nearby sites within about 30 km of our Ilanji yard. A town name is not automatic approval for every surrounding village, so confirm the exact location and access before dispatch.